Cleanly Migrating to new Fiber Director Switches
- From: "Arpotu" <arpotu@xxxxxxxxxxxxxx>
- Date: Mon, 22 Oct 2007 16:43:47 -0500 (CDT)
Hello,
I have several SAN LUNs on a server, all added to LVM. Coming soon, the
fiber between the HBA cards and the director switch will be moving to a
new switch. The SAN admins say the SCSI ID's *might* change in the move.
Question is - is there a "clean" way of migrating the LVM (intact) to the
new fiber switch? The SAN admins say I will be getting the same LU's
back; I just have to ensure the LVM volumes get put back in the same
order.
Thanks,
Arpotu.
--
redhat-list mailing list
unsubscribe mailto:redhat-list-request@xxxxxxxxxx?subject=unsubscribe
https://www.redhat.com/mailman/listinfo/redhat-list
- Prev by Date: RE: Adaptec SCSI RAID 2000S
- Next by Date: Killing Zombie process!
- Previous by thread: Query on NTP
- Next by thread: Killing Zombie process!
- Index(es):
Relevant Pages
- Re: Linux LVM software raid, and SAN question.
... you need massive redundancy supplied by two SAN devices, ... Software raid,
... LVM to mirror and handle the whole damned thing? ... different switch
and a storage port on the same array as the other ... (comp.arch.storage) - rdac failover failing for DS4300 SAN
... I have a DS4300 SAN with 2 controllers, ... each controller has one fibre
connected to each switch. ... To test the resilience I have been pulling fibres
from the back of the ... (comp.unix.aix) - Re: AIX and DS4300 Errors
... if yes try to reset controller's port on the SAN (maybe by SAN's ...
4500 switch which is in turn connected to a controller. ... (comp.unix.aix) - JNI card connectivity with IBM ESS
... V880 server in a SAN environment.The switch type is IBM 2109-F16 and the ...
Storage is IBM ESS 2105-F20. ... SAN foundation kit. ... (SunManagers) - Brief on HSG80 SCSI-3 to SCSI-2 reconfiguration
... The saga of a SAN reconfiguration... ... The switch to SCSI-2 and transparent
failover would be ... This will interrupt access to any disks ... (Tru64-UNIX-Managers)